Rank Engineering supplied, manufactured + installed structural steelwork for the new entrance/reception area at Building 600, Aztec West. This £50K structural steelwork project included temporary propping, cutting out of existing steelwork + connecting to new, lightweight, cold rolled steel walling/fascia, clad with Kingspan panels, as
Rank Engineering recently completed the manufacture and installation of a bespoke spiral staircase in Bedminster, Bristol. Customer was delighted. Expert job!
Rank Engineering, expert steel fabricators of Bristol, have just finished manufacturing the new balustrade (a copy of the Victorian one already in situ), to fit over the new entrance canopy of the famous West End theatre, the Hippodrome, London. This is it, all ready to
Rank Engineering have just finished a barn conversion in Colerne, £50K structural steelwork project.
We recently manufactured a water feature for the Chelsea Flower Show 2017 and we are proud to announce the exhibit was awarded 5 stars!