Rank Engineering, Bristol's Steel Fabrication and Structural Steelwork experts, would like to wish you a happy and prosperous New Year 2020! For all of your metal fabrication solutions, whether it be structural or architectural, bespoke or sheet metal, please get in touch on 0117 955
Rank Engineering have recently completed a 60 tonne, £250K Structural Steelwork project with Meronden Ltd in Bristol whereby they managed the end-to-end manufacture and installation of the New Roof Steelwork to Eagle House, Bristol City Centre. Rank Engineering, Structural Steelwork Experts, Bristol Rank Engineering, Structural
Rank Engineering have just completed a £50K, 10 tonne, Structural Steelwork project with 21st Century Building Services at Berkeley Square, Clifton, Bristol, where we supplied, manufactured and installed a curved, 4 storey, entrance structure. Rank Engineering, Structural Steelwork Experts, Bristol Rank Engineering, Structural Steelwork Experts,
Rank Engineering have just completed a 20 tonne, £55K Structural Steelwork project with WRW Ltd, manufacturing and installing the new roof steelwork to Dean St Student Accommodation in St Pauls, Bristol. Rank Engineering, Structural Steelwork Experts, Bristol Rank Engineering, Structural Steelwork Experts, Bristol Rank Engineering,
Boys and their Toys! Everyone at Bristol's leading steel fabrication specialists, Rank Engineering, is excited about the arrival of our new Teletruck! Thank you to Lister Lift Trucks for your outstanding service. Now to learn how to drive it!
Nice to see Bristol's metal fabrication experts Rank Engineering in the recent edition of Building Design & Construction Magazine for their latest £250K, 60 tonne Structural Steelwork project with Meronden on Eagle House, Bristol City Centre...
Bristol's steel fabrication specialists; Rank Engineering, have just completed the supply and manufacture of an 80kg Thor's Hammer, as an ornament for a private client. Fashioned from a single, solid, steel block and the handle turned, then screwed together, then engraved, this bespoke steel fabrication
60 tonne, £250K Structural Steelwork project in conjunction with Meronden recently finished in Bristol City Centre - Rank Engineering supplied, manufactured and installed a new floor/roof to an existing office block.
Architectural Metalwork project recently completed in conjunction with Moon Architect + Builder - New Build, Kewstoke. Bristol based Rank Engineering supplied Structural Steelwork, Balustrades, External Stairs + Balcony + Brass Door Handles.
Rank Engineering supplied, manufactured + installed structural steelwork for the new entrance/reception area at Building 600, Aztec West. This £50K structural steelwork project included temporary propping, cutting out of existing steelwork + connecting to new, lightweight, cold rolled steel walling/fascia, clad with Kingspan panels, as