60 tonne, £250K Structural Steelwork project in conjunction with Meronden recently finished in Bristol City Centre – Rank Engineering supplied, manufactured and installed a new floor/roof to an existing office block.
60 tonne, £250K Structural Steelwork project in conjunction with Meronden recently finished in Bristol City Centre – Rank Engineering supplied, manufactured and installed a new floor/roof to an existing office block.