Rank Engineering supplied, manufactured + installed structural steelwork for the new entrance/reception area at Building 600, Aztec West. This £50K structural steelwork project included temporary propping, cutting out of existing steelwork + connecting to new, lightweight, cold rolled steel walling/fascia, clad with Kingspan panels, as well as powder coated, pressed aluminium soffit + flashings.